FREE Owner Builder Safety Systems

FREE Owner Builder Safety Systems & PRO Builders Pack

FREE Safe work method statements

FREE safe work method statements (swms) - Image 838x638

Solution

1. FREE Safe Work Method Statements

Safe Work Method Statements are a legal requirements in NSW for all high risk work regardless of the cost of the project. In 2011 SAFE RITE first created Australia’s ONLY, FREE pre-programmed Safe Work Method Statement (SWMS) software to help the construction industry comply with the ever growing demands of workplace safety.

With the SAFE RITE safe work method statement (SWMS) software, owner builders can now easily create SWMS’s in minutes using our comprehensive list of our pre-programmed hazards, risk assesments and control measures knowing they will be fully compliant with the WHS legislation.

This is the only SWMS software in the industry for owner builders.

DONE!  It’s that easy!

2. Professional Builders Pack

For Professional Builders: get access to our “Professional Builders Pack”.  This pack has professional industry level resources:

  • 159 Ready to use SWMS’s
  • 16 High Risk Work Generic SWMS
  • 79 Page WHS Management Plan
  • 420 Page Estimating and Cost Guide
  • Residential Construction Productivity Guide

SAVE up to $4659

 

A safe work method statement (SWMS) is a document that identifies hazards, and the measures to be put in place to control the risks associated with those hazards.

 

 

 

A safe work method statement (SWMS) is required for all high risk work regardless of the cost of the work being done.

 

 

 

All contractors must have SWMS in place before high risk work commences. 

 

 

 

Under clause 292 & 309 of the WHS Regulations, you must have a WHS management plan in place before you start work.

It is a legal requirements for all projects over $250,000

 

 

Since 2011, SAFE RITE has produced and provided FREE safety resources (i.e safety documentation and software) to the building and construction sector to help protect all persons onsite, and also to help ensure compliance with WHS legislation. This policy of assisting our clients and developing resources for the wider industry continues.

 

 

 

  Safe Work Method Statements Features

  FREE for SAFE RITE Owner Builders

  iPad, iPhone and Android Compatible

  Use onsite , at home or office

  Easy to Use

  Site Specific (as required under the WHS Act)

  Perfect for owner builders

  Perfect for builders/contractors/trades

  WHS legislation listed

  Workers Compensation legislation listed

  Codes of Practice

  Australian Standards

  Comprehensive list of Identified Hazards

  Risk Assessment Matrix

  Comprehensive list of Control Measures

  Personal Protective Equipment (PPE) Requirements 

  Environmental Hazards Identified

  Nominated Persons Responsible

  Monitoring and Review of SWMS

  Comprehensive list of Plant and Equipment

  List of maintenance and Inspections

  List of Qualifications

  List of Training and licences required

 

SAFE RITE NSW Owner Builder Course + Project Management Platform

$189

Join tens of thousands of successful owner builders.

Start TODAY!

web counter