An owner builder permit lets you supervise or do building work covered by your approved plans on your own home, but it is not a builder’s licence. Electrical, plumbing, draining, gasfitting and air-conditioning or refrigeration work must always be done by a licensed tradesperson. Here is what that means in practice and how to plan your build around it.
As of November 2026. This is general information. Check the official pages linked in this guide before you decide.
What does an owner builder permit allow?
The NSW Government says you need an owner builder permit to supervise or do work valued at over $10,000 on your own home. You must first have either an approved Development Application (DA) or Complying Development Certificate (CDC), and the permit does not cover work outside that approved project (NSW Government, When an owner-builder permit is needed).
The same page states that an owner builder permit is not a builder’s licence. The NSW Government also says that as an owner builder you are responsible for the building work just as a fully licensed builder would be (NSW Government, Working as an owner-builder).
Which work must a licensed person do?
Regardless of the work’s cost, the NSW Government says specialist tradespeople must be licensed to do:
- electrical wiring
- plumbing, draining and gasfitting
- air-conditioning and refrigeration work (except plug-in appliances)
This work cannot be done under an owner builder permit. For other trade work, the same page says you must have a written contract with licensed tradespeople where the contract is over $5,000 (NSW Government, Working as an owner-builder).
6 ways owner builders can plan who does what
1. Start with your approved plans
Read your DA or CDC conditions and list every stage of work. Your permit covers the approved project, so this list is your boundary. Our guide to getting an owner builder permit covers the permit steps.
2. Mark the work that needs a licence first
Circle electrical, plumbing, draining, gasfitting and air-conditioning or refrigeration on your list. Book these trades early, because the rest of your schedule often depends on them. Safe Rite’s free Auto-Schedule helps you set the trade order.
3. Check each licence before work starts
The NSW Government says you must use an appropriately licensed tradesperson for the work they do. Ask each trade for their licence details and confirm them against the licence on their quote and contract. A check at the start is cheaper than redoing work later.
4. Put contracts over $5,000 in writing
Written terms protect both sides on price, scope and timing. Keep signed copies together in one place so you can find them if a dispute comes up.
5. Decide which tasks you will do yourself
Choose tasks that are inside your approved plans, within your skills and not work that needs a licence. Be honest about time: you carry the responsibility for the finished work, so a task you rush can cost more to fix. Use the free Auto-Budget to compare doing a task yourself with quoting it out.
6. Plan site safety before the first day
The NSW Government says you must keep the site safe under the Workers Compensation Act 1987 and the Work Health and Safety Act 2011, and significant penalties may apply. Safe Rite’s free safe work method statement tools help you prepare documents for high-risk work.
Safe Rite tip: Have a safe work method statement (SWMS) ready before any high-risk work starts. Safe Rite’s SWMS page says SWMS are a legal requirement in NSW for all high-risk work regardless of the cost of the project, and that contractors must have them in place before that work begins. Its free software lets owner builders create them from built-in hazards and controls (Safe Rite SWMS tools).
What are the risks of doing too much yourself?
Doing more yourself can cut labour costs, but the NSW Government says you carry the responsibility of a fully licensed builder for the work. It also lists offences including knowingly hiring unlicensed contractors and lending your permit, with a maximum penalty of $22,000 under the Home Building Act 1989 (NSW Government, Working as an owner-builder). Home building compensation cover is no longer available for work done by an owner builder, so a mistake in your own work is yours to fix.
Frequently asked questions
Can I do my own electrical or plumbing work as an owner builder?
No. The NSW Government says electrical, plumbing, draining, gasfitting and air-conditioning or refrigeration work must be done by licensed tradespeople, whatever the cost.
Is an owner builder permit the same as a builder’s licence?
No. The NSW Government states a permit is not a builder’s licence, and you remain responsible for the work as a licensed builder would be.
Do I need a written contract with my trades?
Yes where the contract is over $5,000. The NSW Government says you must have a written contract with licensed tradespeople.
Can I lend my permit to someone else?
No. The NSW Government lists lending your permit as an offence under the Home Building Act 1989, with a maximum penalty of $22,000.
Do I need a permit for a small job?
A permit is needed for work valued at over $10,000 on your own home. Check the official page for your situation, and see our owner builder FAQs for common questions.
Get your owner builder project off to the right start
Before you book any trades, list your project stages and mark which ones need a licence. Then read owner building costs, savings and risks and how to get your owner builder permit.
The Safe Rite NSW Owner Builder Course (RTO 45002) is approved by NSW Fair Trading and the Building Commission NSW. Register free and pay $189 when you pass, with free budgeting, scheduling and safety tools included. Have a question? See our owner builder FAQs.
Sources
- NSW Government, When an owner-builder permit is needed (no page date shown; accessed 18 November 2026).
- NSW Government, Working as an owner-builder (no page date shown; accessed 18 November 2026).
- Safe Rite, Owner Builder Safety (accessed 18 November 2026).